Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    The Climate-Health Crisis in Urban Environments: Who It’s For and What You’ll Gain

    September 25, 2026

    Overcoming Access Barriers to Evidence-Based Psychiatric Treatments in Inpatient Settings

    September 24, 2026

    Bridging Gaps in Evidence-Based Psychiatric Treatments

    September 23, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    Health Magazine
    • Home
    • Environmental Health
    • Health Technology
    • Medical Research
    • Mental Health
    • Nutrition Science
    • Pharma
    • Public Health
    • Discover
      • Daily Health Tips
      • Financial Health & Stability
      • Holistic Health & Wellness
      • Mental Health
      • Nutrition & Dietary Trends
      • Professional & Personal Growth
    • Our Mission
    Health Magazine
    Home » News » Louisa homeowner sues Amazon over data center construction – Virginia Mercury
    Environmental Health

    Louisa homeowner sues Amazon over data center construction – Virginia Mercury

    healthadminBy healthadminJuly 28, 2026No Comments6 Mins Read
    Louisa homeowner sues Amazon over data center construction – Virginia Mercury
    Share
    Facebook Twitter Reddit Telegram Pinterest Email


    Almost every day, from the driveway of his home and business in Louisa, Austin Newsome sees dozens of dump trucks driving along Route 33, hauling dirt and other debris. The roads are rust-red and stained with dirt pushed out by the construction of Amazon’s newest data center campus in the county.

    One day, Newsom said, the neighbor across the street left.

    “I thought, oh, they’ve already picked me up and gone somewhere,” Newsome said from the garage of Central Virginia Marine, a company he co-owns and operates near his home. “And then I looked up who owned the property and it turned out to be Amazon.”

    Newsom’s home sits on the border of the Northeast Creek Technology Overlay District, a part of the county zoned to attract certain businesses, including data centers.

    This is the site of Amazon’s second data center campus in the county, and plans for the project detail 10 buildings, three electrical substations, stormwater structures, logistics and administrative buildings, and related infrastructure. Construction is expected to be completed in 2031.

    A truck carries barrels of materials down Route 33 in Louisa from the site of an Amazon data center campus under construction. (Photo by Shannon Hecht/Virginia Mercury)

    When the project began in March 2025, Newsom reported some disturbances to county officials (loud noises, trucks kicking up large dust clouds, etc.) and that his tap water had turned brown.

    As construction of the data center continued, water discoloration continued intermittently for several months.

    “(My well) has survived four major droughts since the ’50s and never had a problem,” Newsom said. “I’ve lived here for 11 or 12 years. I never had a problem until I started doing things over there.”

    Newsom and his spouse also experienced loud noises coming from the construction site late at night. They said light pollution from the scene was flooding children’s bedrooms.

    One of his main concerns is dust from the project covering the roads. Amazon responded by deploying street sweepers and spraying water to control the dust. But Newsom said that’s not enough.

    “They brought in trucks that just dumped water on the road. The road is covered in mud. Now all the mud is flowing into my driveway,” Newsom said.

    In August 2025, Newsom filed a lawsuit against the company seeking relief from the negative impact the construction work had on his home and boat detailing and repair business.

    Newsom claimed in his personal nuisance lawsuit that vibrations from the construction work caused cracks in the foundation of his home. Newsom said in his filing that the project is lowering home values, destroying natural drainage and impacting mental health.

    Newsome operates his business from a workshop near his home. He said in the filing that his customers, who often tow boats, have had a number of “near accidents” with trucks.

    The closest school is just one mile from the construction site. Representatives from Louisa Public Schools said the truck has not caused any problems yet.

    Amazon had already built another data center near the Lake Anna power plant in the county and was planning a third project. Withdrawn in July 2025 Due to public backlash.

    Many problems, few solutions

    Newsom has repeatedly complained to county leaders and Amazon. He said he received a promise to look into the matter, but it remains unresolved.

    Board of Supervisors Chairman Duane Adams said he has communicated with the Newsoms multiple times about their concerns and has worked to address some of them.

    “I’ve treated Mr. and Mrs. Newsom the same way I treat all of my constituents. I’m very sensitive and I try to address any issues that may be impacting them and try to de-escalate the situation,” Adams said.

    Once construction began on the data center, Newsom and his family began building a new home.

    He has put his current home up for sale, but said he has not been able to find a buyer because buyers lose interest when they find out that construction is underway across the street.

    A sign advertising a home for sale in Louisa County across the street from an Amazon data center construction site. (Photo by Shannon Hecht/Virginia Mercury)

    There are other faults on the power lines

    Another challenge is that a backup route option for the high-voltage Valley Link transmission line could run through Newsom’s property. The line would provide power to an energy-intensive data center in northern Virginia, potentially forcing Mr. Newsom to demolish the factory where his business operates.

    Map of potential Valley Link infection routes through Louisa County. (Valley Link Transmission)

    “So I’m going to get out of here, but I’m going to stay here,” Newsom said. “(I) end up with two mortgages.”

    No final preferred route has been selected. 115 miles, 765 kilovolt power line It would stretch from Lynchburg to Culpeper County.

    what will happen next

    Newsom’s case remains in court, with a preliminary hearing scheduled for Aug. 19, according to records in the U.S. District Court for the Western District of Virginia in Charlottesville.

    Amazon tried to persuade the court to throw out the nuisance claims lawsuit, arguing in court filings that “brown water, noise, poor air quality, and light pollution are all problems.” The entire nuisance claim must be dismissed because it is not substantive. ”

    U.S. District Judge Jasmine H. Yun allowed the nuisance claim to proceed, but denied Mr. Newsom’s request for an injunction, stating that injunctive relief can still be filed as part of the nuisance claim, but not as a separate claim.

    The Louisa man’s story caught the attention of prominent environmental activist and paralegal Erin Brockovich, who in 1993 led a successful lawsuit against a major oil and gas company for groundwater contamination.

    Brockovich’s latest campaign is raising awareness about the environmental impact of data centers across the country. Brockovich has posted multiple videos. She joined Newsom on her social media to explain his experience and explain his lawsuit.

    Newsom said he intends to continue to push back against the disruption caused by future data center campuses.

    “You know, one person can make a difference,” Newsom said. “So if one person like me can go above and beyond and make as much of a difference as I do in everything, then anyone else can too.”

    You make our work possible.



    Source link

    Visited 6 times, 1 visit(s) today
    Share. Facebook Twitter Pinterest LinkedIn Telegram Reddit Email
    Previous ArticleCMS recognizes advances in medical technology and unveils new pledge | Status
    Next Article One dose of LSD may boost the brain’s ability to stick with new physical skills
    healthadmin

    Related Posts

    The Climate-Health Crisis in Urban Environments: Who It’s For and What You’ll Gain

    September 25, 2026

    The Urgent Health Crisis from Climate and Pollution

    September 12, 2026

    Confronting the Climate-Health Crisis: Impacts on Urban Populations

    September 11, 2026

    The Urgent Health Crisis from Climate Change and Pollution

    September 9, 2026

    The Urgent Health Crisis from Climate Change and Pollution

    September 4, 2026

    The Urgent Health Risks: Climate Change, Pollution, and Environmental Health Impacts

    September 1, 2026
    Add A Comment

    Comments are closed.

    Categories

    • Daily Health Tips
    • Discover
    • Environmental Health
    • Exercise & Fitness
    • Featured
    • Featured Videos
    • Financial Health & Stability
    • Fitness
    • Fitness Updates
    • Health
    • Health Technology
    • Healthy Aging
    • Healthy Living
    • Holistic Healing
    • Holistic Health & Wellness
    • Medical Research
    • Medical Research & Insights
    • Mental Health
    • Mental Wellness
    • Natural Remedies
    • New Workouts
    • Nutrition
    • Nutrition & Dietary Trends
    • Nutrition & Superfoods
    • Nutrition Science
    • Pharma
    • Preventive Healthcare
    • Professional & Personal Growth
    • Public Health
    • Public Health & Awareness
    • Selected
    • Sleep & Recovery
    • Top Programs
    • Weight Management
    • Workouts
    Popular Posts
    • 1773313737_bacteria_-_Sebastian_Kaulitzki_46826fb7971649bfaca04a9b4cef3309-620x480.jpgHow Sino Biological ProPure™ redefines ultra-low… March 12, 2026
    • pexels-david-bartus-442116The food industry needs to act now to cut greenhouse… January 2, 2022
    • 1773729862_TagImage-3347-458389964760995353448-620x480.jpgDespite safety concerns, parents underestimate the… March 17, 2026
    • 1774403998_image_28620e4b6b0047f7ab9154b41d739db1-620x480.jpgGait pattern helps distinguish between Lewy body… March 24, 2026
    • 1773209206_futuristic_techno_design_on_background_of_supercomputer_data_center_-_Image_-_Timofeev_Vladimir_M1_4.jpegMulti-agent AI systems outperform single models… March 11, 2026
    • Leukemia-620x480.jpgBiomimetic platform powers CAR T therapy for… March 9, 2026

    Demo
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    Don't Miss

    The Climate-Health Crisis in Urban Environments: Who It’s For and What You’ll Gain

    By healthadminSeptember 25, 2026

    Explore how urban planning and climate action intersect to improve environmental health, reduce pollution, and build resilient cities for scientists, planners, and advocates.

    Overcoming Access Barriers to Evidence-Based Psychiatric Treatments in Inpatient Settings

    September 24, 2026

    Bridging Gaps in Evidence-Based Psychiatric Treatments

    September 23, 2026

    Bridging the Gaps in 2025-2030 Dietary Guidelines for Metabolic Health

    September 22, 2026

    Subscribe to Updates

    Get the latest creative news from SmartMag about art & design.

    HealthxMagazine
    HealthxMagazine

    At HealthX Magazine, we are dedicated to empowering entrepreneurs, doctors, chiropractors, healthcare professionals, personal trainers, executives, thought leaders, and anyone striving for optimal health.

    Our Picks

    Bridging the Gaps in 2025-2030 Dietary Guidelines for Metabolic Health

    September 22, 2026

    Overcoming Access Barriers: Evidence-Based Insights for Mental Health Professionals

    September 21, 2026

    The Challenge of Updating Dietary Guidelines for Metabolic Health in Clinical Practice

    September 20, 2026
    New Comments
      Facebook X (Twitter) Instagram Pinterest
      • Home
      • Privacy Policy
      • Our Mission
      © 2026 ThemeSphere. Designed by ThemeSphere.

      Type above and press Enter to search. Press Esc to cancel.